Technical Center
Technical center at head office
Based on the policy that "Human resources development is essential for sustaining manufacturing capability", we opened a technical center at the head office in 2007 to train young engineers.
At the center, we have been working on the design of automatic production lines installed in Thailand (elbow automation lines of 3 to 4 inches in 2014 and 6 to 10 inches in 2015) as well as maintenance and management of automatic control.
Collaboration with development group
In collaboration with the development group, we also conduct R&D activities including optimization of manufacturing technologies using FEA (finite element analysis), welding technology of different metals with regard to manufacturing of seismic damper, and processing technology for hard-to-process shape memory alloys.
FEA (Finite Element Analysis)
Seismic dampers